The Nixi 110kV Substation in Xingyi, Qianxinan, Guizhou has a trapezoidal site; the fence is a cement wall with a marble top.
About 600 meters of construction was divided into 6 electric fence zones using Antongruida pulse electronic fence products, 6-wire installation at a height of 80cm, managed and controlled with the AT-KP32 control keypad.
With 4 on-site workers and a construction period of about 6 days, the result was good and recognized by the user, further confirming our cooperation with China Southern Power Grid.