- Budget: ~RMB 00,000
- Products: Pulse Electronic Fence
- Construction: Antongruida
At the Nixi 110kV substation in Xingyi, Qianxinan, Guizhou, the site is trapezoid-shaped with a cement wall structure topped with marble.
About 600 meters was installed in 6 zones using Antongruida pulse electronic fence products, 6-wire configuration, 80cm high, managed and controlled by an AT-KP32 control keypad.
With 4 workers, construction took about 6 days. The results were excellent and praised by the client, once again confirming our cooperation with the Southern Power Grid.